Planning Permission For a Driveway

Posted on: July 23, 2022

It’s worth noting that obtaining planning permission for a driveway can take up to 8 weeks, and it can be even longer in areas with a backlog. However, this planning approval will ensure that your project is compliant right from the beginning, allowing you to focus on the outside space where you park. So how much time do you have to wait? Read on for some tips. After all, you won’t be spending hours in front of your home.

Permeable driveways allow water to pass through

A permeable driveway is a great solution for the drainage problems that plague our driveways. It allows water to pass through and does not trap it, which can lead to a number of problems including access issues and pollution. Resin driveways are an excellent solution to these problems. Permeable surfaces are composed of pores and tiny holes that allow liquids to pass through. This allows for water to be safely removed from the driveway and into the surrounding ground.

One of the most common types of permeable paving is loose aggregates. These are simply spread across a prepared surface and spaced apart so that water can pass through them. As a permeable surface, these driveways are easy to maintain as vehicles can easily move about them. However, this material does require regular maintenance as some of the aggregates may be lost during rain, wind, and footsteps.

They blend in with your yard

If you’re looking to convert your garden to a driveway, you may need to get planning permission. However, some situations are exempt. For example, if you’re changing the front garden into a driveway, you’ll need permission to drop the kerb. You may also need to strengthen the pavement to avoid damaging it. The rules are slightly different for people who live in flats, tenements, or four-in-a-block.

You don’t need to seek planning permission for a front-garden driveway if it’s less than five square metres. Some front-gardens can even be covered by a driveway consisting of wheel tracks. If you want a larger driveway, however, you can install a permeable surface, which allows rainwater to run off to a nearby flower border or lawn.

They are better than main drain

If you’re thinking of turning your garden into a driveway, there are a few things you should know. It may require planning permission to make a driveway in front of a listed building. This means you’ll need to have permission to lower the kerb. In some cases, you may even have to get planning permission to drop the kerb altogether. There are many different types of permission, so it’s important to understand them all before getting started.

In some cases, you don’t even need planning permission for a driveway, as long as it’s a dipped area next to a permeable area. Traditional impermeable driveways block drainage, which can lead to flooding and overburdening sewer systems. Installing a rain garden next to a driveway can help prevent flooding, as well as improving the appearance of the property.